After two weeks of hard work I am ready to launch
on Saturday. I pulled the teak slotted rails which locate
the sliding coach roof and refinished with Cetol.
Standard procedure, I bored out the holes around
the screws and filled with West System epoxy with
microballons. Re-drilled at installation. Bedded in
3m 4200 UV. Came out nice.
No comments:
Post a Comment