Saturday 15 October 2022

The new floor went in, New side windows, new regulator for the alternator, replaced the Raymarine S2G with an S3 computer. The boat was surveyed and found to be in great shape. I did however get a list of things to do. I am going to work through them and post them here. Toady the mast is pulled and I winterized her. Getting the boat shrink wrapped soon.



Tuesday 1 February 2022


 Just an old shot of Hawaii. Reality is, a winter storm is bearing down on us. I am working in my garage on the new instrument panel and a few new cupboards. I tore the floor out of the cabin and need to find a replacement. I'll update when I have something photoworthy.