Wednesday 26 February 2020

I spent the fall working on a bow thruster install. I glassed in a 7 5/16 tube for a Vetus 6 hp thruster which I will bolt in come spring.  I ripped out all the wiring to the helm and tossed most of the electronics. I have been working on it almost every weekend right through the winter.